Additionally there was not enough reinforcement steel used, reducing the tensile capacity of the columns and slabs.The structure in Zolitude was a Maxima shopping centre; a building that contained multiple businesses and a large shopping centre. This is actually quite common as developers find more suited tenants to these types of buildings.

We as engineers need to learn about structural disasters and the failures that caused them to ensure that these occurrences never happen again.Mistakes are easy to make and hard to spot.The codes of practise in New Zealand have had many revisions, especially the Earthquake codes of practise. Rome2rio makes travelling from Seoul to Sampoong Department Store collapse easy. In explosions that would be expected by a terrorist attack or a significant explosion, debris would be hurled in many directions outwards.An investigation was initiated immediately after the collapse. Clearly, not all safety measures are inherently safe – and contractors must exercise caution and common sense before blindly following instructions that may compromise the Integrity of their project.The Sampoong Centre was also fatally flawed at roof level.

A major investigation was held by industry experts. Was the structure code-compliant. The snow exhibits a much greater weight than would be found from a green roof. Air conditioning units are typically found on the roofs of these structures and they exhibit heavy loads. In order to install the shields, however, contractors were forced to cut into the inter-floor support columns, weakening them further still.The government’s continuing commitment to improving workplace safety has led to the imposition of new sentencing guidelines for any business found guilty of breach health and safety law. However, as we are all aware, little things can slip through the net at any stage and additional pairs of eyes are always welcome.
The Sampoong Department store collapsed due to ignorance and punching shear failure (Figure 7). Rome2rio is a door-to-door travel information and booking engine, helping you get to and from any location in the world. Thin flat slabs were present and they were not built to the requirements specified in the drawings. It was a nine-story building with four basement floors and five above grade. A terrorist attack from the North was also eliminated due to the way in which the building collapsed; it collapsed vertically and was contained.

However, the building is still designed with factors of safety or partial factors (1.35 and 1.5 for dead and live respectively in accordance with Eurocodes).